Fittings >> Installation >> Fittings & Installation
Production Installation

  • CAUTION
    The accessories on side Amust be tightened in clockwise
    direction (to the right)while htose on side Bmust be tightened
    in anticlockwise direction (to the left).




1-Air vent     2-Plug     3-Water inlet     4-Water outlet     5-Recommended application
Copyright © Seko Industrial Co.Ltd  Site Developed by ForExporter.com & Jiejing.net. Friend Link: Electric towel radiator, Electric panel heater, Aluminum Die Castings,Die casting,Water filters